Case Study

Hydraulic Systems Isle of Grain

Application Details

This customer required us at Antech to design and supply all the Hydraulic systems, motors and complete the pipework installation.

From a central swivel the Conveyer can be driven to allow the stock piling of Aggregate unloaded from Ships at the Ilse of Grain. Marine environmental issues and Quarry dust were major considerations.

Antech Hydraulics Activity

Antech Hydraulics designed and supplied all the Hydraulic system, motors and complete pipework installation.

The motor brake units were located some 12metres apart with a central underslung HPU. Integration to the main site PLC and Electronics controlled safe movements. Speed of movement is controlled by the Operator using variable electronic flow control to the main pump.

Get in touch

If your mining operations could benefit from our heavy-duty mining equipment, get in touch to find out how we can help.

Cocker Ave
Poulton Industrial Estate
Poulton-Le-Fylde
FY6 8JU
United Kingdom








    eBook Cover

      Download Our Brochure

      Please enter your name and email to access our company eBrochure.

      Please view our Privacy Policy for more information on how we use your data

        Contact me regarding... Hydraulic Systems Isle of Grain

        What brand are you enquiring about?


        Where did you hear about us?


        Fields marked with an * are required.

        For more details on how we handle your data, please view our Privacy Policy.

          Contact Us Today

          What brand are you enquiring about?


          Where did you hear about us?


          Fields marked with an * are required.

          For more details on how we handle your data, please view our Privacy Policy.