This customer required us at Antech to design and supply all the Hydraulic systems, motors and complete the pipework installation.
From a central swivel the Conveyer can be driven to allow the stock piling of Aggregate unloaded from Ships at the Ilse of Grain. Marine environmental issues and Quarry dust were major considerations.






